*Disclaimer

PATRIOT BATTERY METALS INC. (ASX: PMT)

🔗 📄 📈

PMT: Patriot Battery Metals Responds to Short Report

PATRIOT BATTERY METALS INC.

2023-07-10 19:08:00

PMT: PMT Announces Final Core Assay Results from Winter Program

PATRIOT BATTERY METALS INC.

2023-07-10 19:07:00

PMT: Preliminary HLS Metallurgical Testwork Results on CV13

PATRIOT BATTERY METALS INC.

2023-07-05 09:01:00

PMT: Patriot Battery Metals Response to Media Article

PATRIOT BATTERY METALS INC.

2023-06-26 09:53:00

PMT: Patriot Drills 127.7m at 1.78% Li2O at the CV5 Pegmatite

PATRIOT BATTERY METALS INC.

2023-06-15 08:19:00

PMT: Patriot Drills 122.6m at 1.89% Li2O at the CV5 Pegmatite

PATRIOT BATTERY METALS INC.

2023-05-17 08:29:00

PMT: Patriot Extends Strike Length of the CV5 Pegmatite to 3.7km

PATRIOT BATTERY METALS INC.

2023-05-02 08:33:00

PMT: Patriot Provides Update on Environmental and PFS Activities

PATRIOT BATTERY METALS INC.

2023-04-13 08:32:00

PMT: Patriot Drills 83.7m of 3.13% Li2O and Extends Nova Zone

PATRIOT BATTERY METALS INC.

2023-03-30 08:28:00

PMT: Patriot Extends Strike Length of the CV5 Pegmatite to 3.15km

PATRIOT BATTERY METALS INC.

2023-03-24 08:19:00

PMT: Patriot Announces C$50M Flow-Through Financing

PATRIOT BATTERY METALS INC.

2023-03-16 09:27:00

PMT: Phase II HLS Testwork Results on CV5 Pegmatite Material

PATRIOT BATTERY METALS INC.

2023-02-22 09:10:00

PMT: PMT Drills 22.6m @ 1.56% Li2O tesing CV13 Pegmatite Cluster

PATRIOT BATTERY METALS INC.

2023-02-14 08:26:00

PMT: Patriot Extends Strike Length of CV5 Pegmatite by 400m

PATRIOT BATTERY METALS INC.

2023-02-06 08:23:00

PMT: Patriot Drills 52.2m of 3.34% Li2O at the CV5 Pegmatite

PATRIOT BATTERY METALS INC.

2023-01-30 08:29:00

PMT: Patriot Drills 156.9m of 2.12% Li2O at the CV5 Pegmatite

PATRIOT BATTERY METALS INC.

2023-01-19 08:36:00

PMT: Patriot Commences 2023 Lithium Focused Drill Campaign

PATRIOT BATTERY METALS INC.

  1. Mobilization for the 2023 drill campaign has commenced targeting a minimum of 20,000 m over the January to April period (the ‘winter program’)
  2. At least five ( 5) drill rigs will be utilized to complete the winter program
  3. Objective is to extend the 2,200 m strike length of the CV5 Pegmatite system to the east and west and to continue delineation of the recent CV13 discovery, situated ~4.3 km along geological trend to the west -south west

2023-01-06 09:01:00