LPM: Drilling result - Thick High Grade mineralised intersections
LITHIUM PLUS MINERALS LTD. 🔗 📄 📈
- High-grade lithium mineralisation confirmed in all four diamond drill hole assays from Phase 3 drilling at the Lei Prospect.
- Significant intersections of high-grade spodumene mineralisation returned, including 40m @ 1.64% Li2O and 39m @ 1.39% Li2O.
- Mineralisation at the primary Lei pegmatite extended approximately 200m deeper, delivering a larger volume of down-plunge lithium mineralisation.

2023-07-20 10:32:00